• I-276 PA Turnpike
  • I-95 Flyover over I-195, Ramp F, Ramp-B, Ramp-G, !276 (PA Turnpike) Ramp-E & SR 2049 Bucks County
  • Bristol Township & Borough of Middletown
  • Contractor: James D. Morrissey, Inc.
  • The bridge is a 15 span continuous structure.
  • Spans 1 thru 5 are steel beams.
  • Spans 6 thru 12 Prestrssed/Precast PA Bulb T Beams 33/95.5" x 136.04' long , 89.7 ton each, 6 beams per span for a total of 42 beams.
  • Spans 13 thru 15 are steel beams.